New Bay Bridge of San Francisco

New Bay Bridge of San Francisco

The New Bay Bridge is a large civil engineering project taking place between the years 2002 and 2013. The aim of the project was to replace two segments of the Bay Bridge vulnerable to eathquakes by a new structure designed to withstand seismic efforts.

For that project, Dextra was involved on two segments of the renovation project: the approach to Bay Bridge on the San Francisco side, and the Eastern segment from the Island of Yerba Buena to Oakland.

Dextra supplied for this project its Bartec Headed Bar systems. Headed Bars are an anchor disc mounted on the end of a rebar previously prepared for the Bartec system.

The use of Headed Bars provides an smart and compact alternative to long rebar hooks in areas where the reinforcement is particularly congested. Unlike hook bars, Headed Bars are particularly easy to install, as end anchors can just be screwed onto the reinforcement at a later stage, after the reinforcement is installed.

For the approach to the Bay Bridgee in San Francisco and the Yerba Buena Eastern Segment, Bartec Headed Bars were used for the shear reinforcing of the column foundations, as well as in the bridge hinges.

The Bartec Headed Bars solution is approved by CALTRANS, the California Department of Transportation, for all imperial bar size #3 to #18. and is also certified by the ICC-ES.

Show all projects
  • CountryMorocco
  • Start year2011
  • End year2016
  • ContractorBouygues
  • ConsultantTMBYS
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account