Fuqing reactors 5 & 6

Fuqing reactors 5 & 6

Fuqing Reactor 5 & 6 are the first reactors of type Hualong One, based on a 100% Chinese design. Reactors have a capacity of 1,000 MW capacity, with start of operation scheduled for 2019 and 2022.

Dextra has been present on site since the beginning of the construction of the reactor 5 in 2015, and is now involved on the 6th reactor.

For this challenging project, Dextra has been supplying its Griptec rebar splicing solution, which are used for rebar splicing into the APC shell.

Griptec is the preferred rebar splicing solution of the nuclear industry thanks to its unique performance level and an automatic testing process which systematically tests all the connections produced as part of its standard cycle: a guarantee that 100% of the connections perform above project requirement.

More than a million Griptec connections will be used over the years for those two projects, supported by two Griptec equipment installed at site.

Dextra is also supporting the contractor teams at site with two Dextra engineers rotating to ensure operator training, setting and preventive maintenance services, this in order to ensure optimal production day and night thorough production peak times.

Show all projects
  • CountryChina
  • Start year2015
  • End year2019
  • ContractorChina Nuclear Power Engineering (CNPE), China Nuclear Industry 24 Construction (CN24)
  • ConsultantBeijing Starbecs engineering management
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account