Mexico City New International Airport

New International Airport for Mexico City

Mexico City New International Airport is a new infrastructure project designed by Sir Normal Forter and launched in 2014. It is aiming to provide Mexico's capital with a new state-of-the-art airport hub by 2020. The project is located to the East of Mexico City. The project will install an annual passenger capacity of 68 million passengers, more than the previous Benito Juarez Airport (41.7 million passengers annually, already the busiest airport of Latin America). The project features a X-shaped passenger terminal, 3 runways and a control tower.

For this, the largest infrastructure project in Latin America, Dextra has been involved with the supply of its Bartec Rebar Couplers for the foundations of the terminal building (contractor ICA), the transport building (contractor Sacyr) and the control tower (contractor Aldesa).

Bartec coupler, often prefered in seismic areas such as Mexico, substitute on this project all reinforcement lapping of large ASTM #12 rebar (equivalent 38mm). On such large diameters, it is both faster and cheaper to connect bars with couplers rather than traditionnal overlapping.

Bartec rebar coupler equipment a the New Interational Airport of Mexico construction site
Dextra has provided Mexico Airport with up to 10 sets of Bartec equipment (a total of 30 machines, with each set delivered in a container) for all rebar preparation operations. The impressive setup has been supported by our local After Sales team, training the machine operators and maintaining equipment to achieve optimal productivity.

Show all projects
  • CountryMexico
  • Start year2016
  • End year2020
  • Contractor ICA (foundation of terminal building), Sacyr (Transport building), Aldesa (Control tower)
  • ConsultantArup
  • OthersIngetek

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account