West Gate Tunnel

The West Gate Tunnel Project will deliver a vital alternative to the West Gate Bridge, providing a much needed second river crossing, quicker and safer journeys, and remove thousands of trucks from residential streets.


The project will link the West Gate Freeway at Yarraville to the Port of Melbourne and CityLink at the Docklands via twin tunnels beneath Yarraville and an elevated Footscray Road.


The elevated road includes 300 piles of variable height. The piles have been precast in multiple segments, close to the site. Vertical post-tensioning bars assembly together all the segments of each pile.


This construction method of piles is more and more common but requires an impeccable preparation, both in terms of method statement and products definition. Each detail is fundamental for the success of the installation.


Dextra supplied Freyssinet with more than 1,000 tons of Freyssibar+ systems, grade 930/1080 MPa, with nominal diameters of 72mm and 55mm, and 7,500 anchorages for vertical permanent application.


With a close cooperation between DEXTRA, Freyssinet back-office (Technical Department and Freyssinet products company) and the job site staff (Freyssinet Major Project and Freyssinet Australia), the post-tensioning system has been perfectly adapted to the needs of the project.


The bar diameters, steel grade and the design of the anchorages have been validated through qualification tests according to Australian Standards, demonstrating the performance of the system.


This bar system can be used for post tensioning, prestressed ground anchors and any application involving temporary or permanent tie-rods, lifting, suspension, prestressed splices, etc.


Major project construction started in January 2018.

Show all projects
  • CountryAustralia
  • Start year2018
  • End year2024
  • ContractorFICFA WGTP JV and CPBJH JV
  • ConsultantDesign & Built Project
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account