Cairo Monorail

The Cairo Monorail is a two-line monorail rapid transit system in Cairo, Egypt, that is currently under construction. When the project is finished, the two lines will provide the first public transportation linkages from the New Administrative Capital and 6th of October City to the Cairo metropolitan area.


The 54-kilometer line between the New Administrative City and East Cairo will take 60 minutes, while the 42-kilometer line between the 6th of October City and Giza would take 42 minutes.


Dextra supplied more than 300,000 Bartec standard and bridging couplers for the connection of two reinforcement bars. Bartec is simple to install and does not require professional skilled labor, which reduces labor on the job site, formwork costs, and increases job site safety.


Around 400,000 Bartec headed bars were also installed as a replacement for straight or hooked bars in concrete members and connections.


Moreover, the construction site used Unitec bolted couplers in repair works for the connection of two rebars which haven’t been previously prepared (that is, no threads).


The first stage of the system will open to the public in 2022, followed by a second stage in 2023.



Source of images: https://twitter.com/africafactszone/status/1445839423568953345, https://rail.bombardier.com/en/about-us/worldwide-presence/thailand/ en.html/bombardier/projects/middle-east-africa/egypt/innovia-monorail-300---cityflo-650---cairo--egypt/en

Show all projects
  • CountryEgypt
  • Start year2020
  • End year2023
  • ContractorOrascom Construction, Arab Contractors
  • ConsultantINNOVA, SENER, SYSTRA, Hill International
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account