Green Duba ISCC Power Plant

Green Duba Integrated Solar Combined Cycle Power Plant

Duba ISCC Green Power Plant 1 is a large power infrastructure project taking place in the North West of Saudi Arabia, on the Red Sea. The ISCC (Integretad Solar Combined Cycle) technology is adding 50 MW of solar power to the gas & steam turbine generating 500 MW.

For that project, Dextra supplied Double Corrosion Protection Ground Anchors used as a permanent anchoring solution for the excavation works preparing the pumping chamber. A total of 264 anchors (Grade 1080/1230, Ø32 & 40mm) have been supplied and installed on 4 layers.

The Double Corrosion Protection anchors supplied for this project were pre-grouted at Dextra factory (first layer of grout between steel bar and HDPE sleeve). The pre-grouted segments were reconnected at site thanks to couplers. Pre-grouted anchors not only save time and money on site operations, they also allow an overall better anchor quality by performing the first grout layer in a factory-controlled environment.

 

Installation at site was carried out by foundation contractor BAUER, which performed drilling, lifting, installation, grouting and post-tensioning operations. Dextra offered guidance during the early steps of the installation by sending a team of geotechnical specialists at site.

The general sequence of installation is the following (illustrated in pictures below):

  1. After unpacking from shipping racks, splicing of segments with couplers, covered by heat shrink sleeves.
  2. Transportation of assembled anchor from assembly to site to lifting area (13kg per linear meter).
  3. Wiring cable at the head of anchor to control the descent. Grouting pipe also pre-installed along the anchor.
  4. Inserting the 30 meters anchor into drilled hole together with grouting pipe.
  5. After grouting and stressing, a head cap filled with grease is installed on the anchor head, maintain the anchor fully isolated from the corrosive outside environment.

For more information about our excavation and ground solutions in the Middle East, please contact our Dubai office.

Show all projects
  • CountrySaudi Arabia
  • Start year2017
  • End year2019
  • ContractorAl Saad General Contractor
  • Consultant-
  • OthersApplicator: BAUER
    Owner: Saudi Electricity Company

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account