Reconstruction of Pak Kok Pier on Lamma Island

The Reconstruction of Pak Kok Pier on Lamma Island is a project to reconstruct the existing pier located at the northern tip of Lamma Island in Hong Kong, including provision of ancillary facilities such as roof cover, lighting system, benches, and solar panels, etc. and environmental monitoring and mitigation measures.


Due to the primitive design of the Pier and the occasional rough sea condition, the berthing condition of the Pier is unsatisfactory, causing inconvenience to passengers, especially for kids and the elderly, when boarding and alighting. The project aims to improve the berthing condition.


Dextra delivered more than 600 meters of GFRP (Glass Fiber Reinforced Polymer) rebars in straight and bending shapes for the reinforcement of the ferry pier structure.


Dextra GFRP rebar is a corrosion-free alternative to steel rebar. The continuous exposure to seawater and contaminants made it the perfect solution to substitute traditional steel rebars.


Source of images: https://www.devb.gov.hk/filemanager/en/content_1044/20170813_07.html, https://www.ceddreport201519.gov.hk/en/projects-services-detail/portworks

Show all projects
  • CountryEngland
  • Start year2018
  • End year2025
  • ContractorBYLOR JV (Bouygues and Laing O’Rourke)
  • ConsultantICOS JV (Coyne &Belllier, Iosis, Setec)
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account