São Paulo Arena Corinthians

São Paulo Arena Corinthians

The São Paulo Arena Corinthians is a football and multipurpose stadium which was built between 2011 and 2013 in preparation of the 2014 FIFA Worldcup in Brazil.

The stadium has a capacity of 49,000 people, making it the fifth largest stadium in Brazil in term of capacity.

For the construction of the stadium, 80% of the structural elements were made thanks to precast techniques, of which 40% were produced directly on the precast plant set up on site.

For this project, Dextra Do Brasil delivered to contractor Odebrecht, main contractor on this project, its Rolltec rebar coupler solution.

On the São Paulo Arena Corinthians project, Rolltec rebar couplers were used inside the precast elements to provide connections between slabs, beams and columns.

To allow the use of a coupler in the precast element, a rebar ended with a A-type thread is cast into the precast element, with ist thread being protected by a pocket former.

rolltecpocketformer

Once set up at its final location, the pocket former is removed and the space around the thread allows to conveniently screw a Rolltec coupler from the opposing rebar (B-type thread). More than 45,000 Rolltec couplers were used for the rebar connections on the Arena Corinthians. The coupler solution was supported by a Rolltec rebar preparation equipment, installed on site, and Dextra team of engineered in charge of training operators and rolling out preventive maintenance to ensure the equipment was used as its maximum capacity.

Show all projects
  • CountryThailand
  • Start year2016
  • End year2018
  • ContractorITD Thailand
  • Consultant-
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account