Brisbane Airport Link

Brisbane Airport Link

Brisbane Airport link is a motorway from Brisbane business district to the North East of the city in direction of the Airport. The Brisbane Airport links features

The construction of the line has been done by segments. Parts of the line are already operating. Full completion is planned by 2024.

Dextra has been involved since between 2009 and 2011 in the design, engineering and supply of large FRP Soft Eyes for TBM entry/exit points.

Prior to D-Wall construction, Dextra engineers the FRP cage design taking into account size of the TBM, margin for error, soil forces and more design parameters.

Thanks to the properties of FRP material, Tunnel Boring Machines cut through the D-Wall in a minimum time, saving time on schedule and ensuring the perfect condition of the TBM’s head.

On this project, Dextra also supplied Griptec Couplers, used as vertical connections in the D-Walls, barrette piles and tunnel superstructures. More than 80,000 Griptec couplers have been supplied for the tunnels of the Brisbane Airport Link.

Show all projects
  • CountryAustralia
  • Start year2009
  • End year2011
  • ContractorThiess John Holland
  • ConsultantArup and Parsons Brinckenhoff
  • OthersBrisreoPty Ltd - Fabricator

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account