Cebu-Cordova Link Expressway (CCLEX), colossal bridge in the Philippines

Cebu – Cordova Link Expressway is one of the biggest infrastructure projects being undertaken in the Philippines. The project features a combination of a causeway, a gigantic cable-stayed bridge that will cross the navigable zone of the Cebu Strait, two viaducts and four low height bridges, as well as roadways and pedestrian walkways. The CCLEX Project aims to provide better transport facilities while reducing traffic congestion in the region, as well as to improve connectivity within Cebu City. It will also intended to support Cordova’s economic growth, as the expressway will position the City as the gateway for island tourism. Also known as Third Mandaue - Mactan Bridge, the official ground-breaking of the toll bridge was in 2017, with the completion being scheduled for 2022.

Cable-stayed bridge to connect Cebu and Mactan Island

After its completion, the Cebu-Cordova Expressway will link Cebu mainland and Mactan Island through Cordova town. The 8.5 km-long toll bridge will feature two lanes that will serve up to 40,000 vehicles a day. The main bridge will be built with a 400 meter cable-stayed main span, with 60-meter navigation clearance, allowing ships to easily navigate through the expressway. The main bridge of the expressway will connect Guadalupe River to the Shell Island in Cordova, while its colossal viaducts will link it to the causeway and road networks to Mactan.

Dextra Bartec, reinforcing solutions for the construction of Cebu-Cordova Bridge

The design and the construction of this megaproject is undertaken by the Cebu Link Joint Venture (CLJV). The CLJV is a joint-venture partnership between the Spain-based Acciona Construccion S.A. and the Philippines-based First Balfour Inc. and D.M. Consunji Inc. For the reinforcement of the colossal expressway’s foundations, the contractor has chosen Dextra’s well-known rebar splicing solution Bartec. More than 35,000 units of Standard, Bridging, as well as Transition splices of steel grade 75, both in diameter 40 and 50, have been applied to the foundations’ piling cages as of July 2018. Moreover, to provide better end anchorages in congested areas, the CLJV opted for Dextra Bartec headed bars, which are also known as end anchors. Bartec end anchors are a convenient alternative to hooked bars, traditionally used for anchoring.


For more information about rebar coupler availability in Philippines, please contact our Bangkok office.


Photo credit: https://cclex.com.ph/updates/

Show all projects
  • CountryPhilippines
  • Start year2019
  • End year2020
  • ContractorPrime Metro BMD Corporation
  • ConsultantGHD Philippines, AECOM Hong Kong
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account