Burj Khalifa

With a total height of 829.8 m and a roof height of 828 m, the Burj Khalifa is currently the tallest building in the World, and it has held this record since its topping out in 2009.


The building was originally named Burj Dubai but was renamed in honor of the ruler of Abu Dhabi and president of the United Arab Emirates, Khalifa bin Zayed Al Nahyan.


This iconic skyscraper immediately became the symbol of the government of Dubai’s plan to transform the city into a touristic hub and to gain international recognition.


The tower’s structural system consists of reinforced concrete construction from foundation to Level 156; above Level 156 is predominantly a spire, consisting of a structural steel braced frame system. It used 330,000 m3 of concrete and 55,000 tons of steel rebar.


The foundation system is a piled raft: a 3.7 m thick raft supported by 1.5 m diameter bored piles with a diameter of 1.5 m each, extending 50 m below the raft base.


Numerous pile load tests were carried out on the piles of the tower. Crosshole Sonic logging (CSL) testing was also carried out for integrity testing of concrete foundation on a number of works piles, using 20km of Dextra Sonitec tubes.


Sonitec is a simple, fast, and reliable tube solution used for the CSL testing. The system is compliant with ASTM D6760, the standard method for integrity testing by ultrasonic cross-hole testing.


Moreover, more than 100,000 Bartec couplers were supplied for piled-raft extension and reinforcement.

Show all projects
  • CountrySaudi Arabia
  • Start year2009
  • End year2013
  • ContractorSaudi BinLadin Group and Subcontractors
  • ConsultantAtkins, Buro Hapold, KEO
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account