Nagpur Metro, Reach-1 (Line 1)

Nagpur, the second capital of Maharashtra and one of the fastest developing city in India is witnessing major growth in terms of Infrastructure. The development encompasses primarily the connectivity, of which Metro rail becomes a major part.

Incepted in 2016, the metro project is being a subject of acclaimed discussion for its speed of execution and the quality of construction.

Within the city boundaries, it requires the highest standards of safety considerations including the seismic analysis of structure in service life.

Project Requirement

The fast track project has typical structure for its Line 1 alignment, where the viaducts are supporting 2 levels of pathways, lower one for NH-7 and upper one for the metro rail. As the impact loading is a big concern due to train movement. Being the stretch of always busy traffic, a solution was required which does not have to revise the existing design. Plus a major concern was the impact on speed of the otherwise fast moving project. The issue was concerning to all the stakeholders especially the GC for the project, who were looking to maintain the agility as well as find a sustainable solution.

Solution

Dextra Introduced Shear Key Bars for the priority section allowing the structure to neutralize the seismic forces. This not only helped the contractor to get the work done faster, but also enabled the client to go for the trial run earlier than expected.

Show all projects
  • CountryIndia
  • Start year2017
  • End year2018
  • ContractorNCC Limited
  • ConsultantRITES
  • OthersClient: Maha Metro-NMRCL
    PMC: Sytra-Egis-AECOM-RITES

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account