Ahmedabad Gandhinagar metro line India - Phase I

The Ahmedabad-Gandhinagar Metro Rail Project is a new mass-transit rapid transit system in Gujarat, West India. The project is being implemented by Metro Link Express for Gandhinagar and Ahmedabad (MEGA) and aims to meet the city’s growing population while providing commuters with a better transport system. The total length of the metro’s first phase is 39.26 km, with 33.26km of elevated section and 6 kilometers underground. The metro will connect suburbs in Ahmedabad along east-west and north-south axis, and the route will also be extended to Gandhinagar in Phase-2. The construction of the first phase, comprising 32 stations connecting the four corners of the city, has been undergoing since 2015. Being expected to operate in 2020, the first trial run of the metro line is scheduled for January 2019.

Steel sonic logging tubes for concrete integrity tests

For the first phase of the Ahmedabad metro, Dextra is involved in supplying its CSL solution Sonitec for the 6-kilometer long viaduct. Sonitec is Dextra’s sonic logging tube system for Cross-hole sonic logging tests. CSL method allows the contractors to verify the homogeneity of concrete in D-walls, bored piles, drilled shafts, barrettes or in concrete piles. Sonitec helps facilitate the assembly and installation of long tubes in reinforcing cages by its Instant Connection characteristic. Thanks to its large bell-mouth, the tubes can be easily connected seamlessly.

Show all projects
  • CountryIndia
  • Start year2015
  • End year2020
  • ContractorJumar Infraprojects Ltd
  • ConsultantAYESA Consultant
  • OthersOwner: MMRDA

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account