Construction challenges,
solved

Akkuyu

Karachi Nuclear Power Plant (KANUPP)

Karachi Nuclear Power Plant (KANUPP), Pakistan’s first nuclear plant, is undergoing a 2.2GW capacity extension with two pressurized water reactor units of Chinese design (PWR, Hualong 1).


This historical power plant has been in service with a single 137MW reactor unit (Kanupp-1) since 1972. It is owned and operated by Pakistan Atomic Energy Commission (PAEC).


The construction of the Kanupp-2 and Kanupp-3 reactors begun in August 2015 and May 2016, with the start of commercial operations scheduled for 2021 and 2022, respectively.


Dextra Griptec coupler was selected for the connection of steel rebars to reinforce the reactor's concrete shell, designed to successfully withstand an aircraft crash (APC).


More than 1 million units of Griptec standard, position, and transition couplers, mainly in diameter 40mm, have been delivered.


Griptec is well-known for its reliability and performance in tension, compression, and fatigue, thanks to the unique design of the product that complies with the world’s most stringent projects specifications, especially for nuclear reactor building construction.

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account