International Commerce Centre (ICC)| 環球貿易廣場

International Commerce Centre (ICC)| 環球貿易廣場

The International Commerce Centre is a landmark skyscraper in Hong Kong, located in West Kownloon. Thecommercial building is 484 meters high and features 108 floors. It is still to date the tallest building in Hong Kong and among the 10 tallest buildings in the world.

Vertical reinforcement is by definition a key feature for buildings of that height. Consultant ARUP and contractor Sanfield picked Dextra for the splicing of reinforcement across the building. It is to be noted that both stakeholders had already work with Dextra on the similar Two IFC project, another famous 400m+ skyscraper, which was completed a few years earlier.

For this project, Dextra supplied more than 800,000 rebar couplers. Those were used to perform most vertical connections on the structure, in particular all columns.

Rebar couplers also provided connection points for second phase rebar reconnection. Typically between columns and slabs, and between columns and beams. To do so the rebar coupler are aligned horizontally and cast in concrete. Reconnection is only performed at a later stage by screwing in second stage rebar.

Bartec is the preferred reinforcement splicing solution of contractors in Hong Kong as the solutionis recommended in the Hong Kong Building Material List.Dextra also operates its own rebar threading workshop in Hong Kong, providing the rebar preparation service for its customers.

Show all projects
  • CountrySingapore
  • Start year2017
  • End year2025
  • ContractorWoh Hup, CSCES, China Construction Development, China Railway Tunnel Group, Koh Brothers Group
  • ConsultantTYLIN, AECOM
  • Others-

Engineering

At every moment of your customer journey, Dextra teams dedicate themselves to the making of smart construction solutions that allow our customers to reach higher productivity and safety level on their construction sites.

Learn more

Network & Services

Network - Dextra holds physical stocks on several continents, complemented in each country by the local inventories of our distributors. With this extended network, Dextra make sure our products are always at reach and available in reasonable times.

Delivery - For solutions which required to be customized for each project, Dextra can also go beyond our standard delivery times and offer accelerated delivery schemes. Consult us for more information.

Learn more

Manufacturing capabilities

From 3 major industrial sites located in Bangkok (Thailand), Guangzhou (China) and Mumbai (India), Dextra completely owns its manufacturing facilities and processes. This allows us to have complete control over the timing of our operations and the quality of the solutions produced.

Learn more

Testing facility

An independently accredited material testing laboratory, accredited to ISO-IEC 17025, is located at Dextra’s main Bangkok factory, allowing the testing of material and products.

Learn more

Quality & Certifications

Dextra aims to supply products that exceed the most demanding international technical approvals and it is our goal to create maximum customer satisfaction by complying with our clients’ needs and specified requirements.

Learn more

Don't have an account yet? Register Now!
Equipment Spare Part Manual Log in

Sign in to your account